PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

2nd floor Exterior metal framing Facing North.jpg Curtain Wall Mullions 1.jpg Installed door frames at Stair -4 Facing East.jpg Installed sprinkler branches-heads at the 3rd floor Facing North.jpg Installing Monumental Stairs Facing South.jpg 1st floor VAV boxes Facing West.jpg Curtain Wall Mullions 2.jpg Installing copper piping at the 4th floor Facing West'.jpg
Previous pageNext page Installed sprinkler branches-heads at the 3rd floor Facing North
Installed sprinkler branches-heads at the 3rd floor Facing North